Construction & Operations
Fortera tracks progress from the apartment outward and the building inward, enforces the real sequence of work, and scores occupancy-certificate readiness live, no separate Excel, no last-minute scramble.

What's inside
Modules in this pillar
Project hierarchy
Entity → project → tower / block → floor → unit, so every cost, PO and progress tick anchors to exactly one scope.
Progress tracking
Apartment-level (40–45 items) and building-level (15–20 items) tracked together; floors roll up automatically.
Sequencing engine
Enforces dependencies, raft → footing → column → slab; locks before cabling, and surfaces the next eligible task.
Quality assurance
No vendor payment without a passing quality report on file, with an audited owner override.
NOC, RERA & authority approvals
Every approval, RERA, fire, environment, aviation and more, applied, in process, received or expiring, in one register with 90/30/7-day alerts.
Occupancy & handover
A ~67-point OC checklist that scores itself, plus snag lists and a documented handover.
OC readiness, live
A single score, “84% OC-ready”, with the open items called out, accurate to the day.
Field-first input
A site supervisor walks a unit and taps through 40+ items on a tablet, offline if needed.